PSSR 2000 · Worcestershire

PSSR examination and written scheme in Redditch

Written Schemes of Examination and certified pressure system examinations by an independent competent person

Estates reshuffle and plant moves with them: the compressor migrating to the new unit, the receiver sold to the firm two doors down. Under the Pressure Systems Safety Regulations 2000, relocation is a trigger, because a Written Scheme describes an installation, and the installation just changed.

  • Independent & impartial
  • Competent engineer surveyors
  • Reports issued promptly

Pressure equipment we examine

Redditch, Worcestershire

  • Steam boilers & calorifiers
  • Air receivers & compressors
  • Pressure & process vessels
  • Autoclaves & sterilisers
  • Safety valves & protective devices
  • Pipework & heat exchangers
Pressure equipment we examine

PSSR examination and certification for Redditch businesses

Pressure systems across the town run from workshop and production air installations, plenty of them moved at least once, through process plant to the receivers and protective devices of the trading estates.

A moved system is a changed system: pipework runs differently, protective devices may serve new arrangements, safe operating limits deserve re-confirmation against the plant as now connected, and the old scheme describes a room the vessel no longer lives in. Our service treats relocation properly, the scheme reviewed and recertified for the installation as found, examination completed before the system carries production in its new home, and 28 day reports that describe reality, so plant can move as business demands without paperwork quietly dying in the van.

Relocation treated as the trigger
Schemes recertified as found
Examined before reliance
Workshop and production air
How it works

Booking your PSSR examination in Redditch

Moved it, bought it, inherited it in the new unit? We recertify the scheme for the installation as it now stands, examine it and report within 28 days.

  • 1

    Written Scheme

    We prepare and certify your Written Scheme of Examination.

  • 2

    Examination

    We examine each part of the system to the scheme intervals.

  • 3

    Your report

    You receive a report on the condition of the system.

Why businesses choose SEIS

  • Independent and impartial: we examine, we do not sell the equipment
  • Competent engineer surveyors
  • Clear reports issued without delay
  • Single items or whole sites
Areas we cover

PSSR examination and written scheme across Redditch and nearby

Our engineer surveyors cover Redditch and the towns around it across Worcestershire. If your site is nearby, we can almost certainly reach you, so just ask.

RedditchStudleyAstwood BankHeadless CrossWinyatesAlvechurch
Other inspections in Redditch

Related compliance for Redditch businesses

Many sites need more than one statutory regime. If you use lifting gear, pressure systems, work equipment or extraction in Redditch, we can examine all of it.

PSSR FAQs

PSSR examination, written schemes and certification: common questions

Do you carry out PSSR examinations in Redditch?
Yes. Our engineer surveyors cover Redditch and the sites around it, examining moved plant recertified properly. Call us to arrange a visit.
How soon can you examine a pressure system in Redditch?
We keep availability across Worcestershire, so a Redditch visit is usually within a couple of working days, sooner when a system is waiting on its examination before use. Call 0330 043 8191 to book.
What is a Written Scheme of Examination, and do I need one?
It is the legal document at the heart of PSSR: a scheme drawn up and certified by a competent person that sets out which parts of a pressure system are examined, how, and how often. A system within scope must not be operated without one, and the HSE sets the minimum content in its pressure systems guidance.
Is PSSR a legal requirement, and what does it cover?
Yes. PSSR 2000 applies to systems holding steam at any pressure, or other fluids above roughly 250 bar litres, so steam boilers, air receivers, compressors, autoclaves and many process vessels are caught. The duty sits with the user of an installed system or the owner of a mobile one.
How often must a pressure system be examined?
There is no single interval fixed in law. The competent person sets the frequency for each item in the Written Scheme of Examination, judged on the system, its contents and its duty, with many items examined around every 12 months. The examination report is issued within 28 days and carries the next due date.
Who can be the competent person for PSSR?
Someone with the right combination of training, skill, experience and knowledge for the system in question, and independent enough to judge it fairly. The competent person both draws up or certifies the scheme and carries out the examinations it sets.
Does servicing the equipment count as a PSSR examination?
No. A PSSR examination is a formal statutory examination of the system's integrity against its written scheme, and it is separate from routine maintenance. Maintenance keeps a system running; it does not satisfy the legal duty to examine it.
What happens if the examination finds a defect?
The report records the defect, any limit on continued use and the date the next examination is due. Where the competent person finds a risk of imminent danger, the system must be taken out of use at once and the enforcing authority notified, so a problem is acted on rather than filed.

Need a PSSR examination or written scheme in Redditch?

Talk to an engineer surveyor, get a quote and book your inspection in Redditch.