Duty holder guides
A Clean Guide to Switching Inspection Providers
Plain answers from independent engineer surveyors who write these reports every week.
Changing inspection companies is easier than most estates fear and gets fumbled in the same few places: records that never transfer, a Written Scheme nobody owns, and due dates that slip through the handover. This guide covers what moves with you, what to check, and how to time it without a gap.
- Independent & impartial
- Competent engineer surveyors
- Reports issued promptly
Before you switch
- Export every report and the full due date schedule while access is easy
- Establish who holds the Written Scheme for each pressure system
- Check notice terms, especially where inspection is bundled with insurance
- Time the changeover into a quiet stretch of the due date calendar
What transfers, what does not, and who owns what
The records question answers itself once you remember whose duty they serve: examination reports exist so the duty holder can prove compliance, so they are yours to hold whoever produced them. Export everything before the relationship cools, reports, defect histories and the due date schedule, because portal access has a way of ending promptly at cancellation.
Pressure systems add the question estates most often get wrong: the Written Scheme of Examination. The Regulation 8 duty to have a suitable scheme sits entirely with the user or owner, so the scheme is yours even when the outgoing provider's competent person drafted or certified it. Take a copy, hand it to the incoming competent person, and expect them to review it and certify it as suitable, or propose changes, before examining to it. What does not transfer is anybody's goodwill on dates: the statutory clock runs through the handover, and the incoming provider inherits your due dates exactly as they stand.
| Finding | Severity | What you must do | Who is told |
|---|---|---|---|
| Examination reports and defect histories | Yours | Export everything before cancelling portal access | They evidence your compliance, not the provider's |
| The Written Scheme of Examination | Yours | Copy it out and have the new competent person review and certify it | The Regulation 8 duty sits with the user, always |
| Due dates and intervals | Run on | Hand the incoming provider the full schedule on day one | The clock ignores the handover |
| The old provider's templates and portal | Theirs | Expect access to end; rely on your own exports | Another reason to export early |
Where inspection is bundled with insurance, read the policy before giving notice: some bundles carry notice periods or renewal tie ins, and the cleanest switches are timed to the insurance year rather than fought against it.
Timing it, and what the first visit should look like
A clean switch is mostly a calendar exercise, and the first visit tells you whether you chose well.
Time the switch into slack, not into due dates
Map the next six months of due dates before you move. The changeover wants a quiet stretch: enough runway that the incoming provider can be appointed, walk the estate and take over the schedule before anything falls due. Switching a week before a cluster of examinations is how gaps happen, and the regulations have no sympathy for handover friction.
If a date will land inside the changeover anyway, say so plainly to both providers and agree in writing who examines it. An item examined late because two companies each thought the other had it is the classic switching failure, and it is entirely preventable with one email.
What a good first visit looks like
Expect the incoming provider to baseline, not just continue: walk the estate against your schedule, reconcile every item and identifier, review the Written Schemes, and read the recent reports for open defects and trends. Expect some findings the old provider never mentioned; fresh eyes on a mature estate always find something, and that is the value of the switch working.
What you should not accept is a quiet degradation: longer report turnarounds, a scheduling desk where you were promised a surveyor, or due dates managed less tightly than before. The first cycle sets the relationship, so hold it to the promises that won the work.
What you own, what moves with you, and what the incumbent keeps
Switching inspection providers feels risky because duty holders systematically underestimate what they own. Start the whole exercise from the ownership facts and most of the fear dissolves: the examination reports are made to you and the statutory duty to keep them is yours, so the entire compliance history stays in your hands whoever wrote it. The Written Schemes of Examination on your pressure systems belong with the user or owner, you, not with whoever drafted or certified them. Your asset register, your intervals, your defect history, your trend data: yours, yours, yours and yours.
What the incumbent legitimately keeps is their own working papers, their internal survey notes and their systems, and what they take with them is their institutional memory of your plant, the unwritten knowledge in the surveyor's head. That last item is the only real loss in any switch, and the handover discipline in this guide exists mostly to convert it into paper before the door closes.
Frame the decision itself honestly before running the mechanics. Good reasons to switch include chronically thin reports, rotating surveyors with no continuity, assets falling off schedules, service that cannot flex to your production, and pricing that will not survive an unbundled comparison. Poor reasons include one uncomfortable finding, a category you disliked, or a cheaper quote whose surveyor hours per asset do not add up; switching to escape rigour is buying a worse examination at a better price. The statutory intervals run identically under any provider, so the law is indifferent to your choice; the quality of the eyes on your plant is the entire variable.
The compliance gap myth, and the one real gap to engineer against
The fear that keeps estates with poor providers is the gap: some imagined period between providers when the plant is out of compliance. Take it apart, because it is almost entirely myth. Compliance is a property of the equipment and its dates, not of the contract: a hoist examined in March on a 12 month interval is compliant until next March whoever holds your schedule, and the switch changes nothing about that arithmetic. There is no re examination reset on a change of provider, no statutory notification, and no approval process; the law cares that a competent person examines each asset by its due date, and not at all about the logo on the report.
The one real gap is prosaic: a due date that falls after the incumbent's last visit and before the new provider's first. That is a scheduling problem, and it is engineered away with a dated asset list. Extract every asset's next due date, find the window with the fewest dates, and land the changeover inside it; where a handful of dates cannot be moved out of the crossover, have the incumbent examine them on their final round or the new provider open with them. Slack windows exist in every schedule, and our estate level rule of thumb from the pass 4 build stands: time the switch into slack, never into due dates.
Two edge cases deserve deliberate handling. Postponements in flight on pressure systems belong to a specific examination and its competent person, so close them out or hand them over explicitly, never let one straddle the change. And exceptional circumstances do not respect contract dates: a damaged crane in changeover week gets examined by whoever can attend, because the trigger is the event, not the calendar.
Worked example: a forty asset estate switches in six weeks without a wobble
A joinery group, thirty two lifting assets, five pressure systems, three LEV systems, decides to leave its incumbent after two years of rotating surveyors and blank defect sections across an ageing fleet. The switch runs as a small project with a named owner, and the file it produces is a template worth copying.
Week one assembles the record: every current report pulled into one file per asset, the pressure schemes located and confirmed as the estate's own copies, and the due date list extracted, which immediately reveals the slack window, a seven week stretch in early autumn with only two due dates in it. Week two runs the selection the estate wished it had run years earlier: like for like schedules to two candidates, surveyor hours per asset interrogated, named surveyors and report samples requested, and the sample reports read against Schedule 1 and the estate's own thin ones.
Week three sends two letters. The incumbent gets clean notice per the contract, a request for any outstanding reports and survey data, and the final visit scope: the two due dates inside the crossover window. The new provider gets the full record, the register, and the service histories, so their surveyors arrive knowing the plant on paper. Weeks four to six run the baseline first visit: the new provider walks the whole estate, reconciles the register to the metal, finds one vacuum lifter and four slings that existed on no schedule, and opens files with condition notes on every asset, converting the incumbent's departed memory into new written memory.
The first statutory cycle then lands on the existing dates, untouched. Total compliance events during the switch: zero. Total discoveries: five assets that the fear of switching had protected from examination for years.
The handover pack: converting the incumbent's memory into your paper
The only genuine asset the incumbent takes away is unwritten knowledge, so the weeks before notice are for writing it down, and the request list is short and reasonable. Any reports not yet delivered, including the 28 day pressure reports in flight. The thickness readings and measurement series behind the pressure reports, in data form if they hold them that way, because the corrosion trend is worth more than any single report. Any survey notes they will release on condition and known issues, providers vary in generosity here, but the worst answer to a polite written request is no. And explicit confirmation of anything open: postponements, B category defects awaiting closure, scheme comments recommending revision.
Assemble your own side with equal discipline, because the new provider's first examinations are only as sharp as the history they are given. One file per asset: the report chain, service records, modifications, incidents and exceptional circumstance examinations. The pressure schemes, confirmed current, with any unactioned suitability comments flagged honestly. The defect log with closure evidence. The register itself, walked physically before handover, because registers drift and the changeover is the natural moment to true it up.
Hand the open items over like a shift change, not a house sale. A B category with a date needs the new provider to know the date and the required work; an observation trending needs the series; a scheme comment needs the revision task's status. Write the open items on one page, get the new provider to acknowledge each, and the estate's continuity of judgement survives the change of judge.
One courtesy with practical value: tell the incumbent's surveyor, if there is a good one, why you are leaving and thank them. Fields are small, paths recross, and the surveyor who liked your estate answers the odd question long after the contract ends.
Staging the switch: regimes, sites and the people who need to know
Nothing obliges a switch to be total or simultaneous, and the due date map often argues for stages. Regimes can move separately, lifting this quarter, pressure at the scheme year end, LEV at the next TExT, and multi site estates can move site by site, running incumbent and incomer in parallel for a bounded period with the boundary written down: which provider holds which assets, on one page, with no asset on both lists and none on neither. The one discipline staging demands is a single owner for the whole map, because split schedules with no owner is how accessories vanish for a year.
The switch also has an audience beyond the providers, and telling them in the right order prevents the friction that fuels the gap myth. Production and site managers get the changeover calendar first, because new surveyors need access, escorts and machines released. Whoever manages your engineering insurance should know examination arrangements are changing, particularly if you are unbundling an insurer arranged service, so cover and inspection part cleanly at renewal rather than by surprise. Hire desks and any principal contractors you serve get the new provider's name where reports flow to them routinely. And the operators, who will meet unfamiliar engineers asking unfamiliar questions, deserve a line at the shift brief: new examiners, same rules, show them everything.
Expect one cultural wobble and manage it in the open: the incomer's first cycle will find things, and people who liked the quiet old reports may read the new findings as criticism. Say the opposite in advance, loudly, findings are the product, and the estate paid for a sharper pair of eyes on purpose.
Switching mistakes that create the problems the myth predicted
Choosing the incomer: the questions that predict the next five years
The switch is only as good as the provider it lands on, and the selection questions that predict quality are knowable in advance because they are the same attributes whose absence made you leave. Ask for the named surveyors who will hold your plant, their qualifications on your equipment classes, and the provider's answer to continuity: will the same engineers return, because the value of year three's examination is built on year one's memory. Ask for sample reports and read them against Schedule 1 and against the best report in your own file; the sample is the product, everything else is packaging.
Interrogate the quote as surveyor time. Hours per asset class, what is opened, stripped or tested, how accessories are handled on their 6 month tier, what the baseline first visit includes, and what reporting looks like: format, delivery time against the 28 day pressure clock, digital access, and whether measurement data comes as data. Ask the conflict question from the insurer and independent comparison in writing, how is examination judgement separated from any commercial interest in remediation, and time the reply. And ask what happens when they find something serious at four on a Friday, because the answer describes the provider you will actually experience.
Weight responsiveness through the sales process at almost nothing: everyone is responsive while selling. Weight instead the specificity of answers, the willingness to name people, and whether their questions to you are good, a provider who asks for your defect log, your schemes and your duty patterns before quoting is pricing an examination; one who quotes from an asset count is pricing a document run, and our comparison of the provider models covers the structural half of the choice.
The first year with the new provider: banking the switch
The switch pays for itself in the first year or not at all, and the difference is whether the estate manages the new relationship deliberately or relapses into filing reports unread. Set the tone at the baseline visit: walk the estate with the surveyor, hand over the one page of open items, agree the report format and the measurement data flow, and fix the calendar for the full first cycle so production sees every date a year out.
Then read the first cycle's reports like an auditor of your own decision. Expect them to be busier than the incumbent's: a fresh pair of eyes on an ageing estate should produce observations, early B categories and scheme comments, and their arrival is the switch working, not the new provider inventing work. Track two numbers across the year, findings per hundred assets and closure time on dated defects, and compare the reports asset by asset against the incumbent's last cycle; the delta is the quality you bought, in writing.
Hold the incomer to their own sales answers. The named surveyors should be the ones attending; the report delivery times should meet what was promised and the 28 day clock where it applies; the data should arrive as data. Slippage in year one is the honest signal of what year three will look like, and it is far easier to correct while the relationship is young and the file of promises is fresh.
Close the year by rebuilding the two column audit, every asset, examined and serviced, and by writing the one document the next switch will thank you for: a live register with due dates, open items and series data that belongs to the estate rather than to any provider. That document is the real lesson of switching, ownership made permanent, and the estate that keeps it never again fears a change of judge.