PUWER produces a record of inspection, not a certificate, and the difference is the whole document. Regulation 6 requires the result of every inspection to be recorded; what a good record contains, how long it lives, and how it should drive your inspection intervals is this guide's territory.
- Independent & impartial
- Competent engineer surveyors
- Reports issued promptly
Reading your record
- Check the record identifies the equipment, the date and the inspector
- Read the findings with their grades and the reasoning behind each
- Confirm every action has an owner, a date and closure evidence
- Use the run of records to judge whether the interval is still right
What the record must show, and what a good one adds
Regulation 6 requires inspection where safety depends on installation conditions or where deterioration can lead to danger, and requires the result to be recorded. It stops there: no schedule of contents, no prescribed form, no statutory signature block. The legal minimum is a record of the result that can be produced when asked.
A defensible record goes further, and the pattern is consistent across well run estates: identification of the equipment, the date, who inspected and their competence for that class of equipment, what the inspection covered, each finding with the grade given and a sentence of reasoning, the action required with its owner and date, and the closure evidence when the work is done. None of that is prescribed; all of it is what an inspector, an insurer or a court reads the record for.
| Finding | Severity | What you must do | Who is told |
|---|---|---|---|
| Equipment, date and inspector | The identity block | Check the record could only describe this item and this visit | The minimum any record needs to be evidence |
| Findings with grades and reasoning | The judgement block | Read the reasoning line, it shows grading was a decision | Where thin records fail scrutiny |
| Actions, owners, dates and closure | The action block | Chase every open item; an unclosed action is a live finding | What HSE reads after any incident |
| The run of records over time | The trend | Shorten intervals after serious finds, relax after clean runs | Regulation 6 intervals are risk based |
Where the equipment also lifts, the lifting function produces a separate Report of Thorough Examination under LOLER with its own Schedule 1 contents; the PUWER record covers the rest of the machine and the inspections between.
The record as a working document
The record only earns its keep if it does two jobs beyond existing: proving compliance and steering the regime.
Why there is no certificate, and why that is fine
Anyone offering a PUWER certificate is selling a layout, not a legal status: the regulations recognise a record of inspection, and no certificate framing changes what the document is. That is not a weakness. A certificate implies a pass; a record captures a judgement, its reasoning and its follow through, which is far stronger evidence that equipment is actually managed.
Judge any inspection paperwork by whether it would satisfy the question an investigator actually asks: what did you know about this machine, when, and what did you do about it.
Let the records set the intervals
Because Regulation 6 intervals are risk based, the run of records is the evidence that your intervals are honest. A serious finding says the interval was too long: shorten it and note why in the next record. A long clean run supports the interval you have, or a considered extension.
This loop only works if records are kept together per machine and actually read. A record per visit filed and forgotten proves inspections happened; a series read as a trend proves the equipment is managed, and the second is what the regulation was written to achieve.
What Regulation 6 actually requires, and when inspection bites
PUWER Regulation 6 does not put every machine on an inspection cycle. It requires inspection in two situations: where the safety of work equipment depends on the installation conditions, inspection after installation and before first use, and after assembly at a new site or location; and where work equipment is exposed to conditions causing deterioration liable to result in dangerous situations, inspection at suitable intervals, and after every exceptional circumstance liable to jeopardise its safety.
Both limbs end the same way: the result of the inspection is recorded, and the record can be produced. The extent of the inspection is proportionate to the risk, which is the regulation's quiet strength and the reason there is no prescribed form. A visual check of a bench grinder and a strip inspection of a guillotine clutch are both Regulation 6 inspections done properly, provided each is the right depth for the danger, done by someone competent, and recorded.
The line worth drawing on your own estate is between maintenance under Regulation 5 and inspection under Regulation 6. Maintenance keeps the equipment in efficient working order; the inspection is the deliberate check that safety related parts are in place and functioning. One engineer can do both on one visit, but the record must show the inspection happened as its own exercise, because after an incident that distinction is exactly what an investigator tests.
Anatomy of a defensible record
Because the law prescribes no layout, the standard is set by what the record must survive: an HSE inspector after an incident, an insurer's engineer, or a court. Across well run estates the same eight blocks appear, and a record carrying all eight has nothing to fear.
Worked example: a guillotine record, read as an investigator would
A hydraulic guillotine is inspected on its routine cycle. The record identifies the machine by asset and serial, notes the trigger as a scheduled interval inspection, and scopes the visit as guarding, controls, stopping performance and hydraulics.
The findings read: rear guard interlock functioning, stopping time measured within specification, light curtain aligned and tested with the test piece, hydraulic hose to the clamp showing outer sheath cracking with no leakage, graded for planned replacement with a 30 day date, and the foot pedal guard found loose, refixed on the day and closed in the record with the fitter's initials. One finding stops nothing, one is timed, one is closed at the visit: three grades of response, each with a reason attached.
Now run the investigator's questions against it. Was the machine identified? Yes, uniquely. Was the inspection at a defensible interval? The record shows the last date and the next. Was the inspector competent? Named, with their competence for guillotines stated. Were findings judged and actioned? Graded with reasons, owned and dated. Did the actions close? The hose replacement invoice is stapled behind. That record does in five minutes what no certificate could do at all: it proves the machine was managed.
The power press exception: where PUWER writes its own reports
One family of equipment inside PUWER behaves like LOLER: power presses and their guards, governed by Part IV of the regulations. There the regime is prescriptive: thorough examination by a competent person on fixed statutory cycles, 12 months where the press has fixed guards only and 6 months in every other case, plus examination after the installation of guards or protection devices, in shift inspection and testing of the guards by an appointed person after setting and within the working period, and prescribed written reports with serious defects notified to the enforcing authority.
If you run presses, two filing consequences follow. The press paperwork sits alongside your ordinary Regulation 6 records, not inside them, because the statutory reports have their own required contents and their own retention. And the rest of the press cell, the feeding equipment, the tooling handling, the surrounding machines, still lives in the ordinary Regulation 6 world, so a press shop carries both regimes side by side. Treat any provider who quotes one document covering both with caution.
Digital records, and producing them on demand
Nothing in PUWER requires paper. The legal tests are that the result of the inspection is recorded, that the record can be produced when an inspector asks, and in practice that it is attributable to the person who inspected. Digital systems tend to clear those tests better than binders: dates and authorship are automatic, closure trails are timestamped, photos attach to findings, and the next due date can drive the diary directly.
Two disciplines keep a digital regime defensible. First, exportability: the system must produce a readable copy of any record on demand, on site, without a subscription renewal standing between you and your own evidence. Second, continuity: when equipment travels between sites, or the business changes software, the historical records travel too, because the series is the value. Estates that lose their history at every system change are permanently on record one.
The interval loop, and what an inspector reads after an incident
Regulation 6 intervals are risk based, which means they are yours to set and yours to defend, and the run of records is the defence. The loop is simple: a serious finding says the interval was too long, so it shortens, with the reasoning noted in the next record; a long clean run on stable equipment supports the interval, or a considered extension, recorded the same way. An interval that only ever lengthens, or that never changes whatever the findings say, is a loop nobody is running.
After an incident, the questions come in a fixed order, and the records answer all of them or none.
A duty holder whose records walk that list has a defence built over years. One whose records are a drawer of undated tick sheets has a certificate shaped hole where their evidence should be, which is the final argument for treating the record, not any certificate, as the product you are buying.
Who inspects what: competence without a certificate scheme
PUWER never defines the competent inspector by qualification, so the estate has to, and the working rule is that competence scales with consequence. Pre use checks belong to trained operators. Routine Regulation 6 inspections of general workshop equipment sit comfortably with a maintenance engineer who knows the machine class and has been given the time and the checklist to inspect rather than fix. High consequence equipment, guillotines, presses brakes, injection moulders, racking under heavy traffic, woodworking machinery, justifies a specialist, and on that tier independence starts to matter: the person judging the guarding should not be the person whose work the guarding depends on.
Whatever the tier, the record carries the competence: name, role, and why this person was entitled to judge this machine. That line is not bureaucracy, it is the answer to the second question every investigator asks. In house inspectors need their competence evidenced somewhere producible, training records, machine class experience, manufacturer courses, and estates using external inspectors should hold the same evidence about them. A record signed by someone whose competence nobody can describe is a record with its foundation missing.
One estate, four regimes: where the PUWER record fits
Most sites do not run PUWER in isolation, and the record only makes sense inside the family of statutory documents around it. A telehandler illustrates the whole map: its lifting function produces a Report of Thorough Examination under LOLER with Schedule 1 contents; the rest of the machine, brakes, steering, guarding, visibility aids, lives in the PUWER world of Regulation 6 inspections and records; the compressor in the workshop that services it runs under PSSR with a Written Scheme and examination reports; and the extraction bench where its parts are cleaned carries LEV TExT reports under COSHH.
The filing rule that keeps the map navigable is one file per asset, whatever the regime: everything the law says about that machine, in date order, in one place. The trap to avoid is the opposite habit of one file per provider, which scatters a single machine's story across whoever happened to hold the contract each year. When a hire desk, an insurer or an inspector asks about a machine, the answer should be one folder, and the PUWER records are usually the connective tissue in it, because they are the documents that cover everything the specialist regimes do not.
Building the record system from a standing start
An estate that has never run Regulation 6 properly does not fix it by buying forms, it fixes it in a sequence. First, the inventory: every piece of work equipment listed, because the record system can only cover what the estate knows it owns. Second, the sort: against each item, does safety depend on installation, and is it exposed to deterioration liable to cause danger. Items with neither answer yes need maintenance but not the Regulation 6 regime, and writing that reasoning down is itself part of the defence. Third, intervals: set an honest first interval per item from the manufacturer's guidance, the conditions and the consequence of failure, knowing the findings loop will correct it.
Fourth, the first pass: inspect everything once to the eight block standard, and expect it to be the worst set of findings the estate ever produces, because a first inspection harvests years of drift. Fifth, the rhythm: closures chased weekly, the diary driven by next due dates, and the interval loop run at each visit. Six months of that sequence produces something no certificate supplier can sell: a set of records that shows an estate finding its own problems and fixing them, which is precisely the behaviour the regulation was written to create.