PSSR 2000 · Warwickshire
PSSR examination and written scheme in Nuneaton
Written Schemes of Examination and certified pressure system examinations by an independent competent person
The standby compressor is the most misunderstood vessel in Nuneaton: switched off, waiting, and still fully inside the Pressure Systems Safety Regulations 2000, because scope follows connection, not activity. If it can hold pressure into the system, it belongs in the scheme.
- Independent & impartial
- Competent engineer surveyors
- Reports issued promptly
Pressure equipment we examine
Nuneaton, Warwickshire
- Steam boilers & calorifiers
- Air receivers & compressors
- Pressure & process vessels
- Autoclaves & sterilisers
- Safety valves & protective devices
- Pipework & heat exchangers