Mobile Elevating Work Platform (MEWP) Thorough Examinations

MEWP’s Within Industry

Mobile Elevating Work Platforms (MEWPs) are mechanical devices designed to provide safe access for people working at height. They are commonly used as an alternative to ladders or scaffolding and include equipment such as scissor lifts, boom lifts, cherry pickers, and vertical lifts. MEWPs allow operators to reach elevated work areas while carrying tools and materials, offering a stable and controlled working platform.

MEWPs are used for a wide range of tasks, including maintenance, installation, inspection, and repair work. Different types of MEWPs are suited to different environments: scissor lifts are ideal for vertical access in warehouses and factories, while boom lifts provide extended reach for working over obstacles or at varying heights. MEWPs can be powered by electricity, diesel, or hybrid systems, making them suitable for both indoor and outdoor use.

MEWPs are widely used across many industries. In construction and civil engineering, they are essential for structural work, cladding, and finishing tasks. The facilities management sector uses them for building maintenance, lighting, and cleaning. They are also common in manufacturing, warehousing, utilities, telecommunications, energy, events, and film production, where safe access at height is required.

By improving safety, efficiency, and flexibility, MEWPs have become a vital part of modern working-at-height operations. Proper training, regular inspection, and correct selection of equipment help ensure MEWPs are used safely and effectively across all industries.

What’s covered during your SEIS Thorough Examination.

A LOLER (Lifting Operations and Lifting Equipment Regulations 1998)thorough examination of an MEWP, is a legally required inspection carried out  by a competent person to ensure the MEWP is safe for continued use. Below is a detailed breakdown of what is typically covered:

 General Examination

Verification that the MEWP complies with its manufacturer’s specifications and current legislation.
Check of all relevant documentation, such as:

  • CE/UKCA conformity documents
  • Maintenance records
  • Load test and installation certificates
  • Previous thorough examination reports
  •  Confirmation that all safety markings (SWL, ID plates) are legible and accurate.

 Structural Integrity

  • The scissor or boom structure check for structural integrity.
  • End carriages and connection points inspected for alignment, wear, and secure bolting.
  • Examination of welds and joints for signs of fatigue or failure.
  • Panels checked for security.
  • Lifting cage or lifting bed check for damage and overall integrity.
  • Securing fixings checked to ensure suitable and suitably torqued.
  • Pivot pins and keep bolts checked for suitability, correct torque of any fixings and any damage noted.
  • Brakes check their effectiveness in stopping the machinery.
  • Steering joints check for excessive wear or play.

 Mechanical Components

Hydraulic system / hoisting system:

  • Condition of the hydraulic pump unit, hydraulic reservoir and hydraulic hoses.
  • Check for cracks, fractures or excessive corrosion noted to the jib structure and lifting carriage or lifting bed.
  • Wear pads for excessive wear or damage.

Electrical Systems

  • Inspection of control panels, emergency stops, and isolation devices
  • Check all wiring, insulation, and connectors for damage or overheating.
  • Verify operation of travel, hoisting, and lowering.

 Safety and Control Systems

  • Emergency stop circuits tested.
  • Auxiliary Power ensure correct function.
  • Tilt/ level alarm ensure correct function.
  • Overload device ensure correct function.

Functional Testing

Operate the MEWP under a test environment, and check for the following;

  • Smooth operation of all motions.
  • Effectiveness of switches and limiters.
  • Stability during lifting and movement.
  • Emergency lowering function.

 Documentation and Reporting

After the inspection, the competent person will issue a LOLER Thorough Examination Report. This must include:

  • Date of the examination
  • Details of the equipment inspected
  • Findings, including any defects
  • Recommendations or required actions
  • Date of next examination due
  • Statement on whether the equipment is safe to continue using

If any serious defects are found that pose immediate danger, they must be reported to the duty holder and the enforcing authority (e.g., HSE) immediately.

 Summary

A MEWP LOLER inspection ensures that the lifting elements of the machine are safe, compliant, and fit for use. It helps prevent accidents caused by worn, or malfunctioning lifting mechanisms. While it does not replace regular maintenance, PUWER and LOLER inspections are a crucial legal requirement for keeping lifting operations safe and avoiding costly breakdowns or incidents.

Why MEWP Thorough Examinations Matter For You & Your Business. 

Why LOLER98 Thorough Examinations Matter

LOLER98 thorough examinations are a legal requirement in the UK for all lifting equipment used at work, and for good reason. These inspections ensure that lifting equipment, such as cranes, hoists, slings, and lifting accessories are safe to use, and fit for purpose. The nature of lifting operations means that equipment failure can lead to catastrophic consequences, including serious injury, fatalities, and significant damage to property. By carrying out regular, scheduled thorough examinations by a competent person, businesses can identify wear and tear, structural damage, or faulty mechanisms before they result in an incident.

Pros of Getting a Thorough Examination in line with LOLER98

Legal Compliance and Risk Reduction: The most obvious advantage is staying compliant with health and safety law. Compliance avoids potential legal action, fines, or even prosecution. More importantly, it drastically reduces the risk of workplace accidents caused by lifting equipment failure.

Improved Safety Culture: Regular inspections foster a proactive safety culture within the organisation. Employees are more likely to trust equipment and feel safe in their work environment when they know thorough checks are in place.

 Extended Equipment Lifespan: Regularly maintained and inspected equipment typically lasts longer. Examinations can identify early signs of damage or fatigue, allowing for preventative maintenance that avoids costly replacements or repairs.

 Insurance and Liability Protection: Insurers may require evidence of LOLER compliance in the event of an incident. Without valid inspection records, insurance claims could be denied or reduced, leaving the business liable for damages.

 Operational Efficiency: Detecting potential issues before they lead to equipment failure helps prevent unscheduled downtime. This keeps operations running smoothly and avoids the knock-on effects of delayed projects or interrupted workflows.

Cons of Failing to Carry Out LOLER Thorough Examinations

 Legal and Financial Consequences: Failing to comply with LOLER can result in enforcement action from the Health and Safety Executive (HSE), including improvement notices, prohibition notices, fines, or even prosecution. Legal battles and associated costs can be financially crippling.

 Increased Risk of Accidents: Equipment that hasn’t been thoroughly examined is far more likely to fail. Such failures can lead to injuries or fatalities, particularly in high-risk environments like construction or manufacturing. Beyond the human cost, the reputational damage to a business can be severe and long-lasting.

 Higher Repair and Replacement Costs: Neglecting inspections can allow minor issues to develop into major faults. These may require costly emergency repairs or complete equipment replacement, expenses that could have been avoided through routine examinations.

 Loss of Business and Clients: Clients often expect their contractors or suppliers to uphold strict safety standards. A failure to meet legal obligations like LOLER can result in lost contracts or blacklisting from future work, especially in regulated industries.

 Increased Insurance Premiums or Invalidated Coverage: As mentioned, insurers may increase premiums or deny coverage entirely if a business can't provide evidence of up-to-date LOLER compliance, placing a heavier financial burden on operations.

LOLER thorough examinations aren’t just a box-ticking exercise - they are an essential component of a responsible, safety-first approach to using lifting equipment. The benefits of compliance are wide-ranging, from protecting human life to reducing costs and maintaining operational integrity. Conversely, the risks of neglecting these inspections can be devastating on multiple levels.

Key Points;

Examinations must be carried out by a competent person - A competent person is someone with the right practical and theoretical knowledge and experience to conduct thorough examinations of lifting equipment.

Key Points;

Examinations must be carried out in the following situations;

 Before lifting equipment has been put into service, unless - 

  • The equipment has never been used before.
  • An EC declaration of conformity has been drafted up and issued no longer than one year prior to the equipment being put into service.

Key Points;

An employer shall ensure that where the safety of lifting equipment depends of installation conditions, it is thoroughly examined;

  • After installation and before being put into service.
  • After assembly and being put into service at a new site, or a new location at it's current site.

Key Points;

Lifting periods;

  • Every 6 months for lifting accessories and attachments, or for lifting equipment which is used for lifting persons.
  • Every 12 months for other types of lifting equipment which does not fall into the above or below category.
  • In line with an examination scheme, of which, the competent person deems the necessary intervals based on working environment and use etc. 

Key Points;

 A report of thorough examination must contain the following;

  • The date the examination was undertaken and where it was undertaken
  • Means of identifying the equipment (make, model, serial number, SWL etc)
  • Any findings, comments and defects made by the competent person
  • Defects highlighting imminent danger must be forwarded to the relevant authority (HSE) within 28 days. 

Statutory Equipment Inspection Solutions Ltd place picture
5.0
Based on 5 reviews
powered by Google
Danny Marshall profile pictureDanny Marshall
20:43 20 Nov 25
Great experience working with Oliver on the PSSR for our compressors! The team was very professional, knowledgeable, and easy to work with. They made the entire process smooth and stress-free. We would definitely use them again.
Neil Ward profile pictureNeil Ward
15:26 07 Oct 25
We’ve been using Statutory Equipment Inspection Solutions Ltd for our inspection needs, and their service is unmatched by any competitor we’ve worked with. They are extremely professional, always quick to respond to messages, and consistently provide prompt, detailed reports to help us stay compliant with regulations. Highly reliable and a pleasure to work with — we wouldn’t hesitate to recommend them.
Mark Jones profile pictureMark Jones
19:41 01 Oct 25
SEIS have delivered LOLER and PSSR Thorough Examinations for us across Lincolnshire and Cambridgeshire with the utmost professionalism and the highest standards. With brilliant communication and a friendly, knowledgeable approach, we highly recommend their services.
David Fox profile pictureDavid Fox
14:36 24 Sep 25
Oliver at SEIS turned up on short notice to help us out after our current inspections provider let us down. He had our overhead cranes and fork trucks examined, and reports sent to us on the same day. Fantastic service.
Craig Ryan profile pictureCraig Ryan
14:23 24 Sep 25
The engineer surveyor SEIS sent was personable, and knowledgable. They was happy to work around our operational needs and examined our tailboard lifts with minimal disruption.

Thanks again!

Craig

Book LOLER Thorough Examination Near Me

Get In Touch - 0330 043 8191

Name